Burnett Holdings
Burnett Holdings is a commercial development in the centre of Ashburton, one hour south of Christchurch.
The building consists of retail tenancies on the ground floor and office fit-outs on the first floor, so a solution which could cater to all tenants’ needs was required.
The Challenge
Initial construction was a base-build mechanical services arrangement throughout the building. With multiple tenancies, a variety of needs and a relatively small foot print, a VRF
solution was the natural choice.
As office tenants were signed up, there was a need to have a mixture of smaller offices as well as larger open spaces. This presented issues around having a solution that suited the tenants’ needs as well as
being compliant with AS/NZS-5149.1.2016 standard (which superseded AS/NZS-1677.2:2008) in regards to the maximum refrigerant concentration and the safety of the occupants during a potential leak. The inclusion
of this standard was considered as part of the Safety By Design for the project.
The Mitsubishi Electric Solution
A combination of traditional City Multi VRF and City Multi Hybrid VRF (HVRF) was adopted to provide a solution that suited all the projects requirements. Traditional VRF was used in larger areas where
refrigerant concentration was not a concern and HVRF was used in the smaller areas where VRF would be non-compliant with AS-NZS5149.
The small additional cost of Mitsubishi Electric’s City Multi HVRF was less than any refrigerant monitoring that would have been required to make a traditional VRF solution compliant. The
solutions still retained the ability of all systems to simultaneously heat and cool, and allowed the requirements of each space to be satisfied.
The modular system architecture of City Multi VRF and HVRF allowed for a reduced outdoor plant footprint, extended pipe runs and the added efficiency of heat recovery, while still retaining
separate systems for each tenant to enable simple power billing and tailoring to their individual needs.
Equipment Breakdown
Total Capacity
Heating Capacity: 292.5kW
Cooling Capacity: 260.9kW
Outdoor Units
1 x PUMY-P112VKM-A
2 x PURY-P200YLM-A Heat Recovery Units
2 x PURY-P250YLM-A Heat Recovery Units
3 x PURY-P300YLM-A Heat Recovery Units
1 x PURY-P350YLM-A Heat Recovery Unit
1 x PUHZ-RP71VHA5R2-A
Branch Controllers
1 x CMB-P106V-G1
1 x CMB-P1010V-G1
1 x CMB-P108V-GA1
1 x CMB-P1013V-GA1
2 x CMB-WP108V-GA1 (HVRF)
Indoor Units
1 x PEFY-P15VMS1-ER2 Slim Ducted Unit
1 x PEFY-P32VMA-E Ducted Unit
3 x PEFY-P71VMA-E Ducted Units
4 x PEFY-P80VMA-E Ducted Units
4 x PEFY-P100VMH-E2 High Static Ducted Units
1 x PEFY-P125VMH-E2 High Static Ducted Unit
5 x PEFY-P140VMH-E2 High Static Ducted Units
1 x PEFY-P200VHMS-E High Static Ducted Unit
2 x PEFY-WP20VMA-E Ducted Units (HVRF)
4 x PEFY-WP25VMA-E Ducted Units (HVRF)
3 x PEFY-WP40VMA-E Ducted Units (HVRF)
2 x PEFY-WP50VMA-E Ducted Units (HVRF)
1 x PEAD-RP71JAA Split Ducted Unit
Wall Controllers
30 x PAC-YT52CRA-K Simple Wall Controllers
Central Controllers
1 x AE200-E Central Controller
Contractor
Consultant
Publications
City Multi New Zealand Showcase - Edition 2.pdf (10,526 KB),
Created: Monday 8th of September 2014City Multi New Zealand Showcase - Edition 1.pdf (7,386 KB),
Created: Tuesday 11th of June 2013City Multi World Wide Case Studies.pdf (3,184 KB),
Created: Wednesday 23rd of April 2008